Skip to content
A map graphic of the ODOT resurfacing project at state Route 640 (Vine Street) between state Route 283 (Lakeshore Boulevard) and E. 364th St. in the cities of Eastlake, Willoughby, and Willowick. (Submitted)
A map graphic of the ODOT resurfacing project at state Route 640 (Vine Street) between state Route 283 (Lakeshore Boulevard) and E. 364th St. in the cities of Eastlake, Willoughby, and Willowick. (Submitted)
PUBLISHED: | UPDATED:

The Ohio Department of Transportation announced this week that it is proposing to resurface state Route 640 between state Route 283 and East 364th Street in the cities of Eastlake, Willoughby and Willowick.

The Vine Street project will include resurfacing, replacement of curb ramps to meet Americans with Disabilities Act requirements, replacement of pavement markings, and adjustment of existing castings to grade within paving limits.

All work is projected to be completed within the existing right-of-way.

No utilities will be relocated as part of the project, the department confirmed in a news release.

Vehicle and pedestrian traffic will be maintained in the work zone and at all roadway crossings during construction.

Additionally, traffic will be maintained by reducing the number of through lanes or by using flaggers.

The project is scheduled for construction in 2024 with an estimated construction cost of $2.2 million.

The department is seeking public input regarding this project.

Comments can be submitted through www.transportation.ohio.gov/projects/projects/89274.

Comments can also be sent via mail to:

Mark Alan Carpenter, P.E. District Environmental Coordinator, 5500 Transportation Blvd. Garfield Heights, OH, 44125, or by phone at 216-584-2089 or email via mark.carpenter@dot.ohio.gov.

Comments will be received until June 23.